The trestle below is on the rail line that will someday go over the same highway that we went under. There is a lot of red tape that has to clear before they can start on the overhead bridge to extend the rail line up to Caboose Ridge.
We are about to enter a single track tunnel. It goes under part of the parking lot. It is over 200 feet long and has to have a vent in the middle.
We can see the light at the end of the tunnel.
Just after we emerge from the tunnel we are faced with a series of signals that control the yard entry.
Finally, after more than 2 hours, we arrive back where we started from.
WHAT A RIDE!
No comments:
Post a Comment